Project Information: This project involved the demolition and reconstruction of the bridge over Accotink Creek in Fort Belvoir. New caissons were drilled and poured for new abutments. The new bridge included a 120ft steel span, concrete deck, and parapet walls with formliner. Concrete debris generated by the demolition of the existing bridge was recycled onsite… continue reading →
Bridge 260 at WRNMMC
Project Information: Located near Walter Reed National Military Medical Center, this project included the replacement of bridge expansion joints, sidewalk, and asphalt roadway; the installation of a drainage system inside the box girders; the reinforcement of the west abutment with grout; the removal, refurbishment, and re-installation of the aluminum rail system; and concrete restoration. Location:… continue reading →
Bridge 180 at WRNMMC
Project Information: Located near Walter Reed National Military Medical Center, this project consisted of removing the existing structure, installing a Bailey bridge, and then constructing a precast bridge with cast-in-place deck and parapets. Also included was stream protection and 250ft of stream restoration. Location: Stokes Road (GPS Coordinates: 38°59’57.5″N 77°05’27.9″W) Bethesda, MD 20814, USA General… continue reading →